Pre & Post Construction Cleaning
Post-Construction Cleaning to Eliminate Debris, Protect Equipment, Ensure Compliance & Support Operational Readiness
Benefits of Data Center Construction Cleaning
3 Phases of Data Center Construction Cleaning
We offer mission-critical construction cleaning and post-construction cleaning in data centers, cleanrooms, and other controlled environments. For most construction operations, there are 3 stages of cleaning in data centers.
Technicians remain on-site throughout construction to maintain cleanliness
Areas are cleaned to interim industry standards during the process
Assist with commissioning spaces to prepare for customer inspection
Services are billed as standard time and material during this phase
Complete facility cleaning to 5-micron levels to remove airborne particulates
Perform full testing and inspection, documenting all issues and concerns
Provide a detailed environmental report with action items
Prepare the environment for upcoming final inspection and system startup
Final clean performed to 0.3-micron ISO 14644 and ASHRAE standards
Ensure all areas are contaminant-free before equipment installation begins
Deliver a full environmental report to the project or construction group
Confirm facility is compliant, clean, and ready for operational turnover
A lot of manufacturers claim to have a HEPA vacuum
A lot of manufacturers claim to have a HEPA vacuum, but many are not certified. If an EPA inspector walks onto your job site, and your HEPA vacuum is not certified, you can be fined up to $32,500.
Contact us to schedule contamination control services for your construction project.
IEST ISO Standard 14644-5 stages of
construction-related cleaning program
Table F.1
NOTE 1: During Stages 4 to 10, all high-efficiency and ultra-high-purity components, such as fifers, ducts, etc, should arrive on site
protected by plastic or foll covers on both ends. Covers should onty be removed when ready for use.
NOTE 2: During Stages 6 to 10, all activities should be done wearing prescribed cleanroom clothing.
| Stage | Purpose | Responsible Party | Method | Standard |
|---|---|---|---|---|
| Stage 1 — Clean during demolition or preliminary construction such as framing for wall installation. | Prevent unnecessary dust concentration in areas difficult to reach during later construction. | Contractor. If no cleanroom experience, hire a professional cleanroom cleaning contractor. | Vacuum clean upon completion. | Visual-clean. |
| Stage 2 — Clean during utility installation. | Remove contaminants caused by installing electricity, gas, water, etc. | Installation engineer. | Vacuum clean; wipe down piping and fixtures with moistened wipers upon completion. | Visual-clean. |
| Stage 3 — Early cleaning after installation activities. | Clean visible contamination from ceilings, walls, floors, and filter mountings. | Cleaning contractor. | Vacuum clean; wipe down piping and fixtures. Apply protective floor sealants if necessary. | Visual-clean. |
| Stage 4 — Prepare for air conditioning ductwork installation. | Clean dust from ductwork sections before installation while maintaining positive pressure. | Installation engineer and cleaning contractor. | Vacuum clean; wipe down ductwork with moistened wipers. | Wiper-clean. |
| Stage 5 — Clean before mounting air system. | Remove settled dust from ceilings, walls, and floors. | Cleaning contractor. | Wipe down with moistened wipers. | Wiper-clean. |
| Stage 6 — Mount HEPA/ULPA filters into air systems. | Remove contamination caused by filter mounting operations. | Cleanroom HVAC filter engineer/technician. | Clean all surface edges on all sides. | Wiper-clean. |
| Stage 7 — Adjust air conditioning equipment. | Remove suspended dust from airflow and create over-pressure installation. | Cleanroom HVAC filter engineer/technician. | Air conditioning air flushing operation. | Wiper-clean. |
| Stage 8 — Upgrade the room to prescribed classification. | Remove all deposited and clinging dust from ceilings, walls, equipment, and floors. | Professional cleanroom cleaning personnel. | Wipe down all surfaces with moistened wipers. | Wiper-clean. |
| Stage 9 — Upgrade the room to prescribed classification. | Remove all deposited and clinging dust from ceilings, walls, equipment, and floors. | Professional cleanroom cleaning personnel. | Wipe down all surfaces with moistened wipers. | Wiper-clean. |
Â